Calculate the cost per unit produced from machine hourly cost, production rate and material cost.
This calculator finds the true cost of producing one unit by spreading the machine's hourly cost across its production rate and adding material cost — the basis for setting a minimum selling price or comparing production methods.
Given: A machine costs ₹260/hr to run, produces 100 units/hr, with ₹5 material cost per unit.
Result: Cost/unit = (260 ÷ 100) + 5 = ₹7.60 per unit.
Yes for accuracy — divide units/hr by (1 − reject rate) before entering it, so the cost of scrapped pieces is spread across the good units produced.
Once you know the true cost per unit, you can add your required profit margin to arrive at a minimum viable selling price.
These calculators are provided for informational and estimation purposes. Results depend on the assumptions and input values used. Always verify critical engineering calculations against applicable standards, manufacturer specifications, site measurements, and qualified professional advice.