Calculate the total hourly running cost of a machine, combining power, labour, maintenance and overhead.
Machine hour rate is a standard industrial costing concept — the total cost of running a machine for one hour, combining electricity, labour and an allowance for maintenance and overhead. It's the basis for quoting job work, comparing machines, and calculating per-unit production cost.
Given: A 10 kW machine runs at ₹8/kWh electricity, with an operator at ₹120/hr and ₹60/hr maintenance & overhead allowance.
Result: Cost/hr = (10×8) + 120 + 60 = ₹260 per hour.
A common approach is to take annual maintenance, spares, and a share of rent/depreciation for that machine, and divide by its expected annual working hours.
Many businesses do include depreciation as part of the overhead allowance — include it if you want the hourly cost to reflect full ownership cost, not just running cost.
These calculators are provided for informational and estimation purposes. Results depend on the assumptions and input values used. Always verify critical engineering calculations against applicable standards, manufacturer specifications, site measurements, and qualified professional advice.